Texas Administrative Code (Last Updated: March 27,2024) |
TITLE 30. ENVIRONMENTAL QUALITY |
PART 1. TEXAS COMMISSION ON ENVIRONMENTAL QUALITY |
CHAPTER 113. STANDARDS OF PERFORMANCE FOR HAZARDOUS AIR POLLUTANTS AND FOR DESIGNATED FACILITIES AND POLLUTANTS |
SUBCHAPTER D. DESIGNATED FACILITIES AND POLLUTANTS |
DIVISION 5. EMISSION GUIDELINES AND COMPLIANCE TIMES FOR OTHER SOLID WASTE INCINERATION UNITS THAT COMMENCED CONSTRUCTION ON OR BEFORE DECEMBER 9, 2004 |
DIVISION 5. EMISSION GUIDELINES AND COMPLIANCE TIMES FOR OTHER SOLID WASTE INCINERATION UNITS THAT COMMENCED CONSTRUCTION ON OR BEFORE DECEMBER 9, 2004
§ 113.2300. Definitions |
§ 113.2301. When must I comply? |
§ 113.2302. What must I do if I close my other solid waste incineration unit and then restart it? |
§ 113.2303. What must I do if I plan to permanently close my other solid waste incineration unit and not restart it? |
§ 113.2304. What is a waste management plan? |
§ 113.2305. When must I submit my waste management plan? |
§ 113.2306. What should I include in my waste management plan? |
§ 113.2307. What are the operator training and qualification requirements? |
§ 113.2308. When must the operator training course be completed? |
§ 113.2309. How do I obtain my operator qualification? |
§ 113.2310. How do I maintain my operator qualification? |
§ 113.2311. How do I renew my lapsed operator qualification? |
§ 113.2312. What site-specific documentation is required? |
§ 113.2313. What if all the qualified operators are temporarily not accessible? |
§ 113.2314. What emission limitations must I meet and by when? |
§ 113.2315. What operating limits must I meet and by when? |
§ 113.2316. What if I do not use a wet scrubber to comply with the emission limitations? |
§ 113.2317. What happens during periods of startup, shutdown, and malfunction? |
§ 113.2318. How do I conduct the initial and annual performance test? |
§ 113.2319. How are the performance test data used? |
§ 113.2320. How do I demonstrate initial compliance with the emission limitations and establish the operating limits? |
§ 113.2321. By what date must I conduct the initial performance test? |
§ 113.2322. How do I demonstrate continuous compliance with the emission limitations and the operating limits? |
§ 113.2323. By what date must I conduct the annual performance test? |
§ 113.2324. May I conduct performance testing less often? |
§ 113.2325. May I conduct a repeat performance test to establish new operating limits? |
§ 113.2326. What continuous emission monitoring systems must I install? |
§ 113.2327. How do I make sure my continuous emission monitoring systems are operating correctly? |
§ 113.2328. What is my schedule for evaluating continuous emission monitoring systems? |
§ 113.2329. What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems, and is the data collection requirement enforceable? |
§ 113.2330. How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units? |
§ 113.2331. What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? |
§ 113.2332. Is there a minimum amount of operating parameter monitoring data I must obtain? |
§ 113.2333. What records must I keep? |
§ 113.2334. Where and in what format must I keep my records? |
§ 113.2335. What reports must I submit? |
§ 113.2336. What information must I submit following my initial performance test? |
§ 113.2337. When must I submit my annual report? |
§ 113.2338. What information must I include in my annual report? |
§ 113.2339. What else must I report if I have a deviation from the operating limits or the emission limitations? |
§ 113.2340. What must I include in the deviation report? |
§ 113.2341. What else must I report if I have a deviation from the requirement to have a qualified operator accessible? |
§ 113.2342. Are there any other notifications or reports that I must submit? |
§ 113.2343. In what form can I submit my reports? |
§ 113.2344. Can reporting dates be changed? |
§ 113.2345. Am I required to apply for and obtain a Title V operating permit for my unit? |
§ 113.2346. When must I submit a Title V permit application for my existing unit? |
§ 113.2347. What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery? |
§ 113.2348. What is an air curtain incinerator? |
§ 113.2349. When must I comply if my air curtain incinerator burns only wood waste, clean lumber, and yard waste? |
§ 113.2350. What must I do if I close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and then restart it? |
§ 113.2351. What must I do if I plan to permanently close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not restart it? |
§ 113.2352. What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
§ 113.2353. How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
§ 113.2354. What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste? |
§ 113.2355. Am I required to apply for and obtain a Title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and yard waste? |
§ 113.2356. What equations must I use? |
§ 113.2357. Tables Relating to Division 5 |