Texas Administrative Code (Last Updated: March 27,2024) |
TITLE 10. COMMUNITY DEVELOPMENT |
PART 1. TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS |
CHAPTER 23. SINGLE FAMILY HOME PROGRAM |
SUBCHAPTER G. HOMEBUYER ASSISTANCE WITH NEW CONSTRUCTION (HANC) |
SECTION 23.71. Homebuyer Assistance with New Construction (HANC) General Requirements
Latest version.
-
(a) Eligible Activities must meet the ownership requirement in paragraph (1) of this subsection and an Activity described in paragraph (2) of this subsection: (1) Ownership requirement. A site must be owned by the beneficiary or the HOME Activity must include one of the two following Activities: (A) Acquisition of existing single family housing or a parcel; or (B) Refinance of non-owner occupied real property parcel not prohibited for single family housing by zoning or restrictive covenants. (2) All Activities must include New Construction of a unit of single family housing not occupied by the Household prior to assistance; New Construction described in this subsection includes the purchase and installation of a new unit of Manufactured Housing (MHU). (b) The unit of housing in any of the Activities described in subsection (a) of this section must be occupied by the assisted Household as their principal residence for a minimum of 15 years from the Construction Completion Date. (c) If the assisted property is owned by the Household prior to participation, the Household must be current on any existing Mortgage Loans and taxes, and the property cannot have any existing home equity loan liens. HOME funds may not be utilized to refinance loans made or insured by any federal program. (d) The purchase price of acquired property and the post-improvement value of the unit may not exceed the limitations set forth in 24 CFR §92.254. Compliance with the purchase price limitation must be evidenced prior to loan closing. Compliance with the post-improvement value limitation must be evidenced with a final appraisal of the completed project prior to release of retainage. (e) Activity Costs. Total Activity Costs, exclusive of Match funds, are limited to an amount not to exceed the federal subsidy limitations defined in 24 CFR §92.250. Direct Activity Costs, exclusive of Match and leverage, for construction are limited to: (1) Construction of new site-built housing: The Direct Activity Costs are not restricted beyond the Total Activity Costs as identified in this subsection; and (2) Placement of an energy efficient MHU: $90,000. (f) In addition to the Direct Activity Costs allowable under subsection (e) of this section, a sum not to exceed $15,000 and not causing the total subsidy to exceed the limitations set forth by 24 CFR §92.250 may be requested and, if approved, used to pay for any or all of the following, as applicable: (1) Necessary environmental mitigation as identified during the Environmental review process; (2) Installation of an aerobic septic system; and (3) Homebuyer requests for accessibility features. (g) Activity soft costs eligible for reimbursement are limited to: (1) New Construction of site-built housing: no more than $13,500 per housing unit; or (2) Replacement with an MHU: no more than $5,000 per housing unit. (h) Funds for administrative costs are limited to no more than four percent of the Direct Activity Costs, exclusive of Match funds. (i) Homebuyers may choose to obtain financing for the acquisition or construction, or any combination thereof, from a third-party lender so long as the loan meets the requirements of Section 20.13 of this Title (relating to Loan, Lien and Mortgage Requirements for Activities). (j) Direct assistance will be structured as a fully amortizing, repayable loan and will initially be evaluated at zero percent interest. The minimum loan term shall be equal to the required federal affordability period based on the HOME investment, and shall be calculated by setting the total estimated housing payment (including principal, interest, property taxes, insurance, and any other homebuyer assistance), equal to at least the minimum required housing payment. Should the estimated housing payment, including all funding sources, be less than the minimum required housing payment for the minimum term, the Department may charge an interest rate to the homebuyer such that the total estimated housing payment is no less than the required minimum housing payment. In no instance shall the interest rate charged to the homebuyer exceed five percent and such result may deem the applicant as overqualified for assistance. The term shall not exceed 30 years and not be less than 15 years. (1) The total Mortgage Loan may include costs incurred for Acquisition or Refinance, Mortgage Loan closing costs, and Direct Activity Costs, exclusive of Match funds. (2) The total Debt-to-Income Ratio shall not exceed the limitations set forth in Chapter 20 of this Title. (3) For buyers whose income is equal to or less than 50 percent AMFI, the minimum required housing payment shall be no less than 15 percent of the household's gross income. For homebuyers whose income exceeds 50 percent AMFI, the minimum required housing payment shall be no less than 20 percent of the household's gross income. (k) Earnest money may be credited to the homebuyer at closing, but may not be reimbursed as cash. HOME funds may be used to pay other reasonable and customary closing costs that are HOME eligible costs. (l) To ensure affordability, the Department will impose recapture provisions established in this Chapter. (m) For New Construction, site-built housing units must meet or exceed the 2000 International Residential Code and all applicable local codes, standards, ordinances, and zoning requirements. In addition, New Construction housing is required to meet 24 CFR §92.251(a)(2) as applicable. MHUs must be installed according to the manufacturer's instructions and in accordance with Federal and State laws and regulations. (n) Housing proposed to be constructed under this subchapter must meet the requirements of Chapters 20 and 21 of this Title (relating to Single Family Programs Umbrella Rule and Minimum Energy Efficiency Requirements for Single Family Construction Activities, respectively) and must be certified by a licensed architect or engineer. (1) To the extent that a set of architectural plans are generated and used by an Applicant for more than one home site, the Department will reimburse only for the first time a set of architectural plans is used, unless any subsequent site specific fees are paid to a Third Party architect, or a licensed engineer for the reuse of the plans on that subsequent specific site. (2) A NOFA may include incentives or otherwise require architectural plans to incorporate "green building" elements. Source Note: The provisions of this §23.71 adopted to be effective November 26, 2020, 45 TexReg 8327