SECTION 28.86. Bridge Report  


Latest version.
  • (a) Before the department will provide route information to the Texas Department of Motor Vehicles for the issuance of the oversize and overweight permit for a superheavy load, the department must receive from an engineering firm certified under this subchapter a written report that includes a detailed structural analysis of the bridges on the proposed route demonstrating that the bridges and culverts on the route are capable of sustaining the load.

    (b) The report must be submitted in the form prescribed by the department.

    (c) Failure to submit a report in the prescribed form may result in non-consideration of the analysis.

Source Note: The provisions of this §28.86 adopted to be effective November 21, 2013, 38 TexReg 8251