SECTION 330.960. Contents of Authorization Request to Disturb Final Cover Over a Closed Municipal Solid Waste Landfill for Non-enclosed Structures  


Latest version.
  • The owner of a property that includes a closed municipal solid waste landfill shall not disturb the final cover without prior written approval from the executive director. The authorization request shall include the following:

    (1) a certification as set forth in §330.957(b) of this title (relating to Contents of the Development Permit and Workplan Application);

    (2) the existing conditions summary as set forth in §330.957(c) of this title;

    (3) proposed project description including location related to the closed landfill;

    (4) description of the construction/investigation process including, but not limited to, work schedule and safety issues during construction;

    (5) description of the procedures for water and/or methane monitoring and excavated material disposal during construction;

    (6) maps and drawings, site drawing, and general location map to indicate the landfill location; and

    (7) engineering plans, sealed and signed by a licensed professional engineer indicating the proposed project description and its location relative to the landfill.

Source Note: The provisions of this §330.960 adopted to be effective March 27, 2006, 31 TexReg 2502