SECTION 330.958. Construction Plans and Specifications  


Latest version.
  • Construction plans and specifications of the proposed or modified structure shall be prepared and maintained at the structure at all times during construction. After completion of construction, one set of as-built construction plans and specifications shall be maintained at the permitted development. Plans maintained at the structure shall be made available for inspection by executive director representatives.

Source Note: The provisions of this §330.958 adopted to be effective May 17, 1995, 20 TexReg 3241; amended to be effective March 27, 2006, 31 TexReg 2502