SECTION 330.303. Surface Water Drainage for Municipal Solid Waste Facilities  


Latest version.
  • (a) A facility must be constructed, maintained, and operated to manage run-on and runoff during the peak discharge of a 25-year rainfall event and must prevent the off-site discharge of waste and feedstock material, including, but not limited to, in-process and/or processed materials.

    (b) Surface water drainage in and around a facility shall be controlled to minimize surface water running onto, into, and off the treatment area.

Source Note: The provisions of this §330.303 adopted to be effective March 27, 2006, 31 TexReg 2502