Texas Administrative Code (Last Updated: March 27,2024) |
TITLE 30. ENVIRONMENTAL QUALITY |
PART 1. TEXAS COMMISSION ON ENVIRONMENTAL QUALITY |
CHAPTER 217. DESIGN CRITERIA FOR DOMESTIC WASTEWATER SYSTEMS |
SUBCHAPTER A. ADMINISTRATIVE REQUIREMENTS |
§ 217.1. Applicability |
§ 217.2. Definitions |
§ 217.3. Purpose |
§ 217.4. Variances |
§ 217.5. Plans and Specifications General Requirements |
§ 217.6. Submittal Requirements and Review Process |
§ 217.7. Types of Plans and Specifications Approvals |
§ 217.8. Municipality Reviews |
§ 217.9. Texas Water Development Board Reviews |
§ 217.10. Final Engineering Report |
§ 217.11. Construction of an Approved Facility |
§ 217.12. Substantial Design Changes |
§ 217.13. Final Construction Drawings and Specifications |
§ 217.14. Completion Notice |
§ 217.15. Inspection |
§ 217.16. Wastewater Treatment Facility Operation and Maintenance Manual |
§ 217.17. Collection System Records |
§ 217.18. Provisions that Apply to All Sections in this Chapter |
SUBCHAPTER B. WASTEWATER TREATMENT FACILITY DESIGN REQUIREMENTS |
§ 217.31. Applicability |
§ 217.32. Organic Loadings and Flows for New Wastewater Treatment Facilities |
§ 217.33. Flow Measurement |
§ 217.34. Organic Loadings and Flows for Existing Wastewater Treatment Facilities, Re-Ratings, and Alterations |
§ 217.35. One Hundred-Year Flood Plain Requirements |
§ 217.36. Emergency Power Requirements |
§ 217.37. Disinfection System Power Reliability |
§ 217.38. Buffer Zones and Odor Abatement |
§ 217.39. Wastewater Treatment Facility Use of Reclaimed Water |
§ 217.40. Signs with Emergency Contact Information |
SUBCHAPTER C. CONVENTIONAL COLLECTION SYSTEMS |
§ 217.51. Applicability |
§ 217.52. Edwards Aquifer |
§ 217.53. Pipe Design |
§ 217.54. Criteria for Laying Pipe |
§ 217.55. Manholes and Related Structures |
§ 217.56. Trenchless Pipe Installation |
§ 217.57. Testing Requirements for Installation of Gravity Collection System Pipes |
§ 217.58. Testing Requirements for Manholes |
§ 217.59. Lift Station Site Requirements |
§ 217.60. Lift Station, Wet Well, and Dry Well Designs |
§ 217.61. Lift Station Pumps |
§ 217.62. Lift Station Pipes |
§ 217.63. Emergency Provisions for Lift Stations |
§ 217.64. Materials for Force Main Pipes |
§ 217.65. Force Main Pipe Joints |
§ 217.66. Identification of Force Main Pipes |
§ 217.67. Force Main Design |
§ 217.68. Force Main Testing |
§ 217.69. Maintenance, Inspection, and Rehabilitation of the Collection System |
§ 217.70. Reclaimed Water Facilities |
§ 217.71. Storage Tanks for Reclaimed Water |
SUBCHAPTER D. ALTERNATIVE COLLECTION SYSTEMS |
§ 217.90. Applicability |
§ 217.91. Edwards Aquifer |
§ 217.92. Component Sizing |
§ 217.93. General Requirements |
§ 217.94. Maintenance and Inspection Program |
§ 217.95. Alternative Collection System Service Agreements |
§ 217.96. Small Diameter Effluent Sewers |
§ 217.97. Pressure Sewers |
§ 217.98. Vacuum Sewer Systems |
§ 217.99. Testing Requirements |
§ 217.100. Termination |
SUBCHAPTER E. PRELIMINARY TREATMENT UNITS |
§ 217.120. General Preliminary Treatment Requirements |
§ 217.121. Coarse Screens |
§ 217.122. Fine Screening Devices |
§ 217.123. Screenings and Debris Handling |
§ 217.124. Grit Removal Systems |
§ 217.125. Grit Chambers |
§ 217.126. Grit Handling |
§ 217.127. Pre-aeration Units |
§ 217.128. Flow Equalization Basins |
§ 217.129. Primary Clarifiers |
SUBCHAPTER F. ACTIVATED SLUDGE SYSTEMS |
§ 217.151. Requirements for an Aeration Basin |
§ 217.152. Requirements for Clarifiers |
§ 217.153. Requirements for Both Aeration Basins and Clarifiers |
§ 217.154. Aeration Basin and Clarifier Sizing--Traditional Design |
§ 217.155. Aeration Equipment Sizing |
§ 217.156. Sequencing Batch Reactors |
§ 217.157. Membrane Bioreactor Systems |
§ 217.158. Solids Management |
§ 217.159. Process Control |
§ 217.160. Operability and Maintenance Requirements |
§ 217.161. Electrical and Instrumentation Systems |
§ 217.162. Air Lift Pump Design |
§ 217.163. Advanced Nutrient Removal |
§ 217.164. Aeration Basin and Clarifier Sizing--Volume-Flux Design Method |
SUBCHAPTER G. FIXED FILM AND FILTRATION UNITS |
§ 217.181. Applicability |
§ 217.182. Trickling Filters--General Requirements |
§ 217.183. Nitrifying Trickling Filters--Additional Requirements |
§ 217.184. Dual Treatment Using Trickling Filters |
§ 217.185. Rotating Biological Contactors |
§ 217.186. Nitrifying Rotating Biological Contactors |
§ 217.187. Dual Treatment Utilizing Rotating Biological Contactors |
§ 217.188. Submerged Biological Contactor |
§ 217.189. Dual Treatment Systems Using Submerged Biological Contactor |
§ 217.190. Filtration |
§ 217.191. Additional Requirements for Deep Bed, Intermittently Backwashed, Granular Media Filters |
§ 217.192. Additional Design Requirements for Multi-Compartmented, Low Head, Automatically Backwashed Filters |
§ 217.193. Cloth or Disk Filter Systems |
§ 217.194. Alternative Designs for Effluent Polishing |
SUBCHAPTER H. NATURAL TREATMENT UNITS |
§ 217.201. Applicability |
§ 217.202. Primary and Secondary Treatment Units |
§ 217.203. Design Criteria for Natural Treatment Facilities |
§ 217.204. Imhoff Tanks |
§ 217.205. Facultative Lagoons |
§ 217.206. Aerated Lagoons |
§ 217.207. Stabilization Lagoons |
§ 217.208. Evaporative Lagoons |
§ 217.209. Constructed Wetlands |
§ 217.210. Constructed Wetlands--Free Water Surface Design |
§ 217.211. Constructed Wetlands--Subsurface Flow System General Design |
§ 217.212. Overland Flow Process |
§ 217.213. Integrated Facultative Lagoons |
SUBCHAPTER J. SLUDGE PROCESSING |
§ 217.241. General Requirements |
§ 217.242. Control of Sludge and Supernatant Volumes |
§ 217.243. Sludge Pipes |
§ 217.244. Sludge Pumps |
§ 217.245. Exclusion of Grit, Grease, and Debris from Sludge Processing Units |
§ 217.246. Ventilation and Odor Control |
§ 217.247. Chemical Pretreatment of Sludge |
§ 217.248. Sludge Thickening |
§ 217.249. Sludge Stabilization |
§ 217.250. Sludge Dewatering |
§ 217.251. Sludge Storage |
§ 217.252. Final Use or Disposal of Sludge |
SUBCHAPTER K. CHEMICAL DISINFECTION |
§ 217.271. Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination System Redundancy Requirements |
§ 217.272. Capacity and Sizing of Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems |
§ 217.273. Cylinder Requirements for Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems |
§ 217.274. Dosage Control for Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems |
§ 217.275. Requirements for 150 Pound Cylinders used in Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems |
§ 217.276. Requirements for One-Ton and Larger Cylinders used in Gas-Withdrawal Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems |
§ 217.277. Requirements for One-Ton and Larger Cylinders used in Liquid-Withdrawal Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems |
§ 217.278. Safety Requirements for Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems |
§ 217.279. Equipment and Material Requirements for Gaseous Chlorine Disinfection and Sulfur Dioxide Dechlorination Systems |
§ 217.280. Design of Sodium Hypochlorite Disinfection and Sodium Bisulfite Dechlorination Systems |
§ 217.281. Application of Chlorination and Dechlorination Chemicals |
§ 217.282. Other Chemical Disinfection and Dechlorination Processes |
§ 217.283. Post-Disinfection Requirements |
SUBCHAPTER L. ULTRAVIOLET LIGHT DISINFECTION |
§ 217.291. Ultraviolet Light Disinfection System Definitions |
§ 217.292. Ultraviolet Light Disinfection Systems Effluent Limitations |
§ 217.293. Ultraviolet Light Disinfection Systems Redundancy Requirements |
§ 217.294. Ultraviolet Light Disinfection Systems Monitoring and Alarms |
§ 217.295. Ultraviolet Light Disinfection Dosage and System Sizing |
§ 217.296. Ultraviolet Light Disinfection Bioassay Test Procedure |
§ 217.297. Ultraviolet Light Disinfection Reactor Design |
§ 217.298. Ultraviolet Light Disinfection System Cleaning and Maintenance |
§ 217.299. Ultraviolet Light Disinfection System Safety |
§ 217.300. Post-Disinfection Requirements |
SUBCHAPTER M. SAFETY |
§ 217.321. Safety Design of a Wastewater Treatment Facility |
§ 217.322. Safety and Security Audits |
§ 217.323. Hazardous Operation and Maintenance |
§ 217.324. Chemical Handling |
§ 217.325. Railings, Ladders, Walkways, and Stairways |
§ 217.326. Electrical and Fire Code Compliance |
§ 217.327. Non-Potable Water |
§ 217.328. Wastewater Treatment Facility Access Control |
§ 217.329. Color Coding of Pipes |
§ 217.330. Drinking Water Supply Connections |
§ 217.331. Freeze Protection |
§ 217.332. Noise Levels |
§ 217.333. Confined Spaces |