SECTION 117.1354. Final Control Plan Procedures for Attainment Demonstration Emission Specifications  


Latest version.
  • (a) The owner or operator of utility boilers listed in §117.1300 of this title (relating to Applicability) at a major source of nitrogen oxides (NOX ) shall submit to the Office of Compliance and Enforcement, the appropriate regional office, and the Office of Air, a final control report to show compliance with the requirements of §117.1310 of this title (relating to Emission Specifications for Eight-Hour Attainment Demonstration). The report must include:

    (1) the methods of NOX control for each utility boiler;

    (2) the emissions measured by testing required in §117.1335 of this title (relating to Initial Demonstration of Compliance);

    (3) the submittal date, and whether sent to the central or the regional office (or both), of any compliance stack test report or monitor certification report required by §117.1335 of this title that is not being submitted concurrently with the final compliance report; and

    (4) the specific rule citation for any utility boiler with a claimed exemption from the emission specification of §117.1310 of this title.

    (b) The report must be submitted by the applicable date specified for final control plans in §117.9130 of this title (relating to Compliance Schedule Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation Sources).

Source Note: The provisions of this §117.1354 adopted to be effective June 14, 2007, 32 TexReg 3206; amended to be effective June 25, 2015, 40 TexReg 3965