SECTION 116.311. Permit Renewal Application  


Latest version.
  • (a) In order to be granted a permit renewal, the permit holder shall submit information in support of the application which demonstrates that:

    (1) dockside vessel emissions associated with the facility will comply with all rules and regulations of the commission and with the intent of the TCAA, including protection of the health and property of the public and minimization of emissions to the extent possible, consistent with good air pollution practices.

    (2) the facility is being operated in accordance with all requirements and conditions of the existing permit, including representations in the application for permit to construct and subsequent amendments, and any previously granted renewal, unless otherwise authorized for a qualified facility;

    (3) the facility meets the requirements of any applicable New Source Performance Standards as listed under Title 40 Code of Federal Regulations (CFR) Part 60, promulgated by the EPA under the authority of the FCAA, §111, as amended;

    (4) the facility meets the requirements of any applicable emission standard for hazardous air pollutants as listed under Title 40 CFR Part 61, promulgated by EPA under the authority of the FCAA, §112, as amended; and

    (5) the facility meets the requirements of any applicable maximum achievable control technology standard as listed under 40 CFR Part 63, promulgated by the EPA under FCAA, §112 or as listed under Chapter 113, Subchapter C of this title (relating to National Emissions Standards for Hazardous Air Pollutants for Source Categories (FCAA §112, 40 CFR 63)).

    (6) the facility meets the requirements of Subchapter C of this chapter (relating to Hazardous Air Pollutants: Regulations Governing Constructed or Reconstructed Major Sources (FCAA, §112(g), 40 CFR Part 63)).

    (b) In addition to the requirements in subsection (a) of this section, if the commission determines it necessary to avoid a condition of air pollution or to ensure compliance with otherwise applicable federal or state air quality control requirements, then:

    (1) the applicant may be required to submit additional information regarding the emissions from the facility and their impacts on the surrounding area; and

    (2) the commission shall impose as a condition for renewal only those requirements the executive director determines to be economically reasonable and technically practicable considering the age of the facility and the impact of its emissions on the surrounding area.

    (c) A compliance history review must be conducted in accordance with Chapter 60 of this title (relating to Compliance History).

Source Note: The provisions of this §116.311 adopted to be effective July 8, 1998, 23 TexReg 6973; amended to be effective September 12, 2002, 27 TexReg 8546