Texas Administrative Code (Last Updated: March 27,2024) |
TITLE 30. ENVIRONMENTAL QUALITY |
PART 1. TEXAS COMMISSION ON ENVIRONMENTAL QUALITY |
CHAPTER 112. CONTROL OF AIR POLLUTION FROM SULFUR COMPOUNDS |
SUBCHAPTER F. REQUIREMENTS IN THE HUTCHINSON COUNTY NONATTAINMENT AREA |
DIVISION 4. REQUIREMENTS FOR THE PHILLIPS 66 BORGER REFINERY |
SECTION 112.230. Applicability
Latest version.
-
(a) The requirements in this division apply to affected sources at the Phillips 66 Refinery, which is located in Borger, Texas at coordinates latitude 35.700000 and longitude -101.366666 in the Hutchinson County sulfur dioxide nonattainment area. Affected sources will remain subject to this division regardless of ownership, operational control, or other documentation changes. (b) Affected existing sources are designated by the source name (when possible) and emission point number (EPN) used in the site's New Source Review (NSR) permit as issued on the specified date. The specific affected sources are as follows: (1) Unit 29 FCCU Stack (EPN 29P1) in NSR Permit 9868A dated September 17, 2021; (2) Unit 40 FCCU Stack (EPN 40P1) in NSR Permit 9868A dated September 17, 2021; (3) SRU Incinerator (EPN 34I1) in NSR Permit 9868A dated September 17, 2021; (4) SCOT Unit Incinerator (EPN 43I1) in NSR Permit 9868A dated September 17, 2021 (emissions from this source during authorized maintenance, startup, and shutdown activities are included as EPN SRU_MS_CAP in the attainment demonstration modeling); (5) EPN 66FL1, EPN 66FL2, EPN 66FL3, and EPN 66FL12 in NSR Permit 80799 dated October 1, 2020 (emissions from these sources are included as EPN FLARE_R_CAP and EPN FLARE_MS_CAP in the attainment demonstration modeling); (6) EPN 12E1, EPN 12E2, EPN 12E3, EPN 12E4, EPN 12E5, EPN 12E6, EPN 12E7, EPN 7E1, EPN 7E2, EPN 7E3, EPN 7E4, EPN 7E5, EPN 7E6, EPN 10H1, EPN 19B1/19H1, EPN 19B1/19H2, EPN 19H3, EPN 19B2/19H4, EPN 19H5, EPN 19H6, EPN 2H1, EPN 2H2, EPN 22H1, EPN 26H1, EPN 28H1, EPN 29H4, EPN 34I1, EPN 36H1, EPN 40H1, EPN 4H2, EPN 42H1, EPN 42H2, EPN 43I1, EPN 50H1, EPN 5H1, EPN 6H1, EPN 7H1-4, EPN 9H1, EPN 93E1, EPN 93E2, EPN 98H1, EPN 51H1, EPN 4H1, EPN 6H3, EPN 12H1, and EPN 41H1 in NSR Permit 9868A dated September 17, 2021 (these sources included as EPN FLEX_R_CAP in the attainment demonstration modeling); and (7) EPN 12E1, EPN 12E2, EPN 12E3, EPN 12E4, EPN 12E5, EPN 12E6, EPN 12E7, EPN 7E1, EPN 7E2, EPN 7E3, EPN 7E4, EPN 7E5, EPN 7E6, EPN 10H1, EPN 19B1/19H1, EPN 19B1/19H2, EPN 19H3, EPN 19B2/19H4, EPN 19H5, EPN 19H6, EPN 2H1, EPN 2H2, EPN 22H1, EPN 26H1, EPN 28H1, EPN 29H4, EPN 36H1, EPN 40H1, EPN 4H2, EPN 42H1, EPN 42H2, EPN 50H1, EPN 5H1, EPN 6H1, EPN 7H1-4, EPN 9H1, EPN 93E1, EPN 93E2, EPN 98H1, EPN 51H1, EPN 4H1, EPN 6H3, EPN 12H1, and EPN 41H1 in NSR Permit 9868A dated September 17, 2021 (these sources are included as EPN FLEX_MS_CAP in the attainment demonstration modeling). Source Note: The provisions of this §112.230 adopted to be effective October 27, 2022, 47 TexReg 6985