SECTION 65.211. Preparation of Nonstandard Boilers for Inspection  


Latest version.
  • Nonstandard boilers shall be prepared for inspection as described in §65.210, with the following additional requirements.

    (1) External lagging and insulation shall be removed and ultrasonic thickness measurements shall be performed for the first inspection and at five-year intervals for subsequent inspections; and

    (2) Any other inspections or examinations as required by the department shall be performed to determine the condition of the boiler.

Source Note: The provisions of this §65.211 adopted to be effective June 15, 2015, 40 TexReg 3121